When it comes to EV charging in apartment buildings, some committees assume a traditional 7kW EV Charger (a.k.a. Level 2) is the better option. The goal is typically an incremental deployment of shared chargers in visitor car spaces with little to no planning for what happens when those chargers are overwhelmed. But when did Level 2 become the default? and why is a Level 1 EV charger so rarely considered? Level 1 charging via a power point is more common than most people expect. Nearly half of Australian EV owners who charge at home do it from a standard power point. That hasn’t been an option for apartment buildings before but over the last few years, it has become commonplace among progressive apartment buildings.
Think about your EV like your phone.
How do you charge your phone? You plug it in by your bed, go to sleep and pick it up in the morning. You don’t share your charger with the neighbour. You don’t know what time the battery reached 100%, and you don’t care. All that matters is that it has enough charge to get you through tomorrow.
Charging an EV should work the same way.
Apartment buildings don’t need to dedicate valuable visitor parking to EV charging or assume everyone needs a Level 2 charger in their parking space when cars are parked overnight. They need access to power for every resident, at a cost that is achievable.
So the question isn’t Level 1 or Level 2. The more useful question is what works for your building. Neither option is better in every case. It comes down to what suits your building.
Level 1 vs Level 2 Charging at a Glance
| Level 1 Charging | Level 2 Charging | |
| Typical power | 2.4–3.5 Kilowatt (kW) | Up to 22 kW |
| Typical range added | 12–22 kilometres (km) per hour | 30–130 km per hour |
| Best suited to | Overnight and long-dwell charging | Faster charging and shared spaces |
| Infrastructure | Lower-powered connection | Dedicated EV charging circuit and equipment |
| Electrical demand | Lower | Higher |
| Relative installation cost | Generally lower | Generally higher |
| Apartment use case | Dedicated resident parking | Shared bays, high-use drivers or faster turnaround |
| Cost | $700 – $1,500 per unit | $4,500 – $9,000 per unit |
Australian Government guidance describes Level 1 charging as a lower-cost option that is easier to install and suitable for overnight charging where a resident has a dedicated parking space and there is appropriate load management in place.[1] Level 2 charging is quicker, but it requires dedicated EV charging equipment and generally places greater demand on a building’s electrical infrastructure.[1]
Cost follows the same pattern. Level 2 chargers are considerably more expensive than Level 1 chargers to purchase and install, which is part of why Level 1 is the more cost-effective approach, with Level 2 chargers added selectively where higher speed is needed. [1]
What is a Level 1 EV Charger?
A Level 1 EV charger plugs into a standard power socket and is the simplest way to charge an EV. Level 1 charging, sometimes called trickle charging, uses a lower-powered supply, typically a standard 240V power point, and draws a steady amount of electricity over a longer period, with no dedicated high-powered hardware needed.[2] For strata buildings, the Australian Government classifies Level 1 charging as typically running between 2.4 and 3.5 kW, adding roughly 12 to 22 kilometres of range for every hour of charging.[1]

A key consideration is how much energy is actually needed to travel day to day, rather than how long it takes to charge a battery from empty to full. The Australian Government estimates that the average Australian vehicle only travels around 33 kilometres per day.[2] This means many EV owners do not need to recharge the entire battery every night. They only need to replace the energy used during their normal daily driving. Research has shown that drivers primarily utilising a Level 1 EV charger typically charge two times per week.
A vehicle parked at home overnight may therefore have eight, ten or twelve hours available to replace that daily energy use.
A Level 1 electric car charger is well suited when:
- Residents have dedicated parking spaces
- Vehicles remain parked overnight
- The building wants to minimise additional infrastructure requirements
- Charging needs to scale across many parking spaces
Our Intelligent Power Socket (IPS) is a Level 1 EV charger designed for long-dwell environments such as residential strata. The IPS is available in 10 amp (A) and 15A configurations, providing approximately 12–15 kilometres of range per hour at 10A and 18–22 kilometres per hour at 15A.
What is a Level 2 EV Charger?
A Level 2 EV charger delivers between 7 and 22kW of power. It needs dedicated equipment on its own circuit with a higher-voltage outlet and sometimes a dedicated EV distribution board.[1] A larger Level 2 installation will generally need new building infrastructure sized for higher peak demand and/or power upgrade.[1]
Level 2 charging may be more appropriate when:
- Vehicles have shorter dwell times, typically less than 3 hours
- A charger is shared between multiple users
- Drivers regularly travel significantly longer distances
- Faster charging provides a clear operational benefit
Please note, most EVs in Australia max out at 7kW or 11kW AC, so not all can take advantage of 22kW charging.
For more detail on higher-powered charging equipment and installation, see our Level 2 Charging page.

Why Does Level 2 Charging Require More Building Capacity?
The more EVs a building has, the more this matters.
One higher-powered charger is usually easy for a building to accommodate. But as more residents switch to EVs, giving that same maximum charging capacity to dozens or hundreds of car spaces becomes a very different infrastructure problem.
To put it in perspective, two hours on a 7 kW charger uses around 14 kWh of electricity. That’s roughly what a single-person household in NSW uses in an entire day. Multiply that across 50 or 100 car spaces charging in the same evening and the building’s electrical demand climbs quickly. This is why most buildings cannot support a Level 2 solution without major power upgrades and/or sophisticated load management.
Why Load Management Matters
Whether a building chooses Level 1, Level 2 or a mix of both, it has a fixed amount of electrical capacity to share. As more residents switch to EVs, how the building manages that total load becomes just as important as the power of any single charger.
A load management system monitors the building’s available capacity and keeps charging demand within safe limits. Australian Government guidance recommends load management wherever multiple chargers are installed, and notes that charging rates can be reduced when needed to protect the building’s power supply.[1]
This is where Level 1 and Level 2 really differ. Level 1 charging starts with a lower draw per car space, so the same capacity stretches across far more residents before load management has to slow anything down. Level 2 draws more per car, so load management has to work harder, often throttling chargers well below their rated speed once several cars are plugged in. On a busy night, a 7 kW charger can end up delivering much the same output as a standard power point. Residents still get their overnight top-up, but the building has paid Level 2 prices for Level 1 performance.
Our Intelligent Power Socket (IPS) is built around this. It works with our cloud-based NOX Management System (NMS), which monitors every IPS in real time, and each device uses dynamic and time-based load balancing to keep charging within the limits of the building’s existing electrical infrastructure. Where a site adds Level 2 chargers, they can be managed within the same system.
The focus moves away from how powerful one charger is and onto how fairly the building’s available power is shared across every resident who needs to charge. For apartment buildings, that’s what matters long term.
Why Charging Speed is the Wrong Question to Ask
Most people, when thinking of EV charging, compare it to what they know: the petrol station. So, when an apartment building starts looking at EV charging, the first questions are almost always about speed. How fast can we charge? How many cars can charge at once? How much power do we have available? How many cars can charge at the same time?
They’re relevant questions, but they’re the wrong place to start. A petrol station and an apartment car park solve different problems. At a highway charging station, a driver wants to recharge and continue their journey as quickly as possible. At home, the car arrives at 6 pm and remains parked until 7 am. The car is staying parked regardless.
Starting with speed is also where costs get out of hand and make the projects go nowhere. Imagine a building gets a quote for half a million dollars to upgrade its power supply, and that’s without any chargers installed. Before considering Level 2 to be the only option, it’s worth asking:
- What is the current demand? Are there only a couple of residents? Or is there a growing demand?
- What are the current constraints? Are there budget constraints? Resistance from residents or the committee members? Are there any building constraints (no visitor spots, car stackers, major works planned)
- How do we give every resident who needs charging fair access to ensure scalability?
- Does the investment make financial sense for the owners corporation?
We applied this approach at Sierra Hawthorn, where 253 charge points now serve residents in a single strata building. It is proof that building-wide charging can be delivered at scale. Read the full project story in our case study: Australia’s Largest EV Charging Project.
Can an Apartment Building Use Both Level 1 and Level 2?
Yes. In some cases, a combination of charging types can be more practical than applying the same solution to every parking space.
A building might provide:
- Level 1 charging in dedicated resident bays for regular overnight charging
- One or more Level 2 chargers in shared spaces
- Load management across the wider charging network
Australian Government guidance specifically notes that a combination of charger types may be the most appropriate choice, depending on residents’ needs. We take the same approach. While our Intelligent Power Socket (IPS) provides scalable Level 1 charging, it can also incorporate higher-powered Level 2 charging where a site would like to add faster charging.
The goal is not Level 1 everywhere or Level 2 everywhere. It is providing the right solution that satisfies the building’s needs.
So, Which is Right For Your Apartment Building?
Instead of asking “how fast can we charge?” and “how many EVs can we charge simultaneously?” ask: “How do we give every resident a reliable overnight charge in their own car space, at a cost our building can sustain?”
For most apartment buildings, the answer is Level 1, with Level 2 added where faster charging genuinely makes a difference.
Think about your phone again. You do not need it full at 2am. You need it ready when you walk out the door, with enough charge for the whole day. EV cars are no different.
If your committee is weighing up Level 1, Level 2, or both, we can guide you through the options and help with the transition. See apartment case studies we have helped with so far.
Contact NOX Energy to start the conversation.
References
- Australian Government Department of Climate Change, Energy, the Environment and Water, Installing a personal EV charger for strata building residents.
https://www.energy.gov.au/electric-vehicles/owning-electric-vehicle/charging-options-houses-and-strata/installing-personal-ev-charger-strata-building-residents/ - Australian Government Department of Climate Change, Energy, the Environment and Water, Electric vehicle charging equipment.
https://www.energy.gov.au/electric-vehicles/owning-electric-vehicle/electric-vehicle-charging-equipment/