Case Study: Parkline Adelaide

About Parkline Parkline Adelaide is a 12-storey apartment building at Dequetteville Terrace, Kent Town, overlooking Adelaide’s parklands. Developed by Chasecrown and built by Multiplex, it was completed in early 2026 with 61 apartments, mostly bought by owner-occupiers downsizing. It’s an all-electric building designed for net-zero operation, with a 7-star average energy rating, an extensive solar array and an embedded network. Parkline is managed by Whittles. Sources: The Urban Developer, Build Australia The Challenge At settlement, every owner was offered the embedded network provider’s own Level 2 charger. It suited some residents, but not everyone wanted to pay for one. A number of residents went to Whittles with a simpler request. Could they just install a power point and pay for the electricity they use? Traditionally, that means a separate meter for every bay. The strata or building manager reads each one and bills residents by hand. It’s slow, admin-heavy, and doesn’t scale. Did You Know? Nearly half of Australian EV owners who charge at home do it from a standard power point, according to the Electric Vehicle Council. Source: State of Electric Vehicles 2026, Electric Vehicle Council The NOX Energy Approach Dan Porter, National Growth & Sustainability Manager at Whittles, knows the NOX product well. His suggestion was simple: install NOX instead. It’s low cost, and it gives residents more than enough charge for everyday driving, with metering and billing built in. NOX was approved for the whole building. We installed the base infrastructure, then let residents opt in when they were ready. Residents chose what suited the way they drive: Residents simply pay for the device to be installed and then the electricity they use. No subscriptions, no costs per user, no manual meter reads, no admin for Whittles. A building-wide Wi-Fi network was also installed to connect every device. It’s secured, not open to residents, and can support other building services in future, like security systems. Results Installation was completed in October 2026, with residents charging from day one. Parkline now offers both Level 1 and Level 2, so every resident can charge the way they drive. Key Project Findings “Residents came to us asking for a simple power point they could pay for themselves. Traditionally, that means separate meters and a lot of manual work for the building manager. NOX was the obvious answer: low cost, more than enough charge for everyday driving, and no admin for us. Having a Level 2 option for residents who drive further made it a great result for the whole building.” Dan Porter, National Growth & Sustainability Manager, Whittles What This Means for Strata Buildings An embedded network doesn’t have to mean one charging option. Parkline shows residents can choose Level 1, Level 2 or both, on one managed system There is no one size fits all approach for a building, but there are options available for you to choose to ensure the right one for your building. Contact NOX Energy to start the conversation.