About Boxshall Residences
Boxshall is a residential strata building that has already invested in early EV infrastructure, including a dedicated EV distribution board and Ethernet cabling to every car park bay. The groundwork was there, but no chargers or Load Management System (LMS) had ever been installed, leaving residents without a usable solution despite the preparation that had already taken place.
Barriers to EV Charging
The incomplete rollout left residents with immediate charging needs in limbo. The strata committee needed a whole-of-building solution that could be delivered without delay, building on the existing infrastructure rather than duplicating or replacing it, and capable of serving current EV owners as well as those who would make the switch in the future.
The NOX Energy Solution
NOX Energy assessed the existing distribution board and Ethernet infrastructure and designed a solution that leveraged what was already in place. The IPS units are connected via the existing Ethernet cabling at each bay, avoiding additional civil works and significantly accelerating the installation timeline. The result was a complete, building-wide charging network delivered in one month from start to finish.

Testimonials
“Great outcome and exceptional service.”
Jim Kampouris, Tideways Owners Corporation Manager
“The OC at 59 Carpenter Street, Brighton, was seeking an EV charging system that also maintained and protected the electricity supply to our building. The OC decided to install one NOX Energy IPS per apartment for all 15 apartments in the building. The attention to detail, communication, speed of installation and installation management by the NOX Energy team was excellent. We have now had our system in place for about 6 months, and the follow-up from NOX, where needed, has been exemplary.”
Peter Alexander, OC Member Boxshall Residences
Results
Boxshall went from stalled infrastructure to a fully operational EV charging network across the entire building in just one month. Residents with immediate needs were connected from day one, and the building is now equipped to support growing EV uptake without any further infrastructure investment required.
Approximate Project Costs:
- 15 IPS’ installed
- Electrical Backbone Upgrades: $0
- NOX Energy IPS Hardware/Installation: $11,000
Total: $11,000